Pre cleaning up work with bananas tree trunks and soak it for about a weeks. In order to clean away the acid that left behind during cement plastering.
Some simple netting covering works are in progress.
Pre cleaning up work with bananas tree trunks and soak it for about a weeks. In order to clean away the acid that left behind during cement plastering.
Some simple netting covering works are in progress.
After be come a certified vendor, a drat of 5 ft by 10 ft concrete pond is started and a series of discussion and some understanding with principle were begin.
Actual construction of 6 numbers 5ft by 10 ft ponds concrete slab were started with a layer of A4 BRC.
Brick laying of 2ft height ponds are started with a proper setting up.
Complete brick laying work and follow with a proper water proofing system were in progress and than with a water pounding test are started. Due to budget constraint I decided to construct 4 pounds first instant of 6 pounds but with standby of a 6 pound slap provided are in consideration...
How ever we intent put 4000 Medicinal Leeches' seed ( Hirudo Medicinalis ) in to two pounds as a first generation... If every thing come to order 4000 more will introduce as a second generation ..